MMS Blog
January Go-To Guy: Bill Lekki, Precious Plate
Precious Plate says it goes to Bill for solve engineering problems, new product development, quoting, environmental reporting, company-wide engineering support and much more.
Read MoreJanuary's Go-To-Guy: Bill Lekki, Precious Plate
Bill Lekki, technical director of Precious Plate, began working for the company 35 years ago and is the Go-To-Guy. Also: Adrian “Sergio” Sanchez and Kally Powell from All-Color Powder Coating.
Read MoreBernard Mitchel Wins NASF California Bright Design
Annual program prompts students to develop “next generation” creative and engineering solutions utilizing surface technology.
Read MoreAAC Releases Educational Course for Architects
Anodizing 101: Building, Construction & Design is approved for continuing education units by the AIA, the GBCI and NARI.
Read MoreWhy We Are Opening a Plating Shop in Mexico
KC Jones Plating Co. explains why they are joining several other finishing shops in opening branches nin Mexico, the No. 1 exporter of automotive parts to the U.S.
Read MoreTOP SHOPS: Danco Metal Finishing
Danco Metal Finishing offers a complete range of surface preparation, anodizing and identification techniques.
Read MoreEisenmann’s E-Cube Simplifies Paint Operations
Paint separation system reduces disposal, maintenance costs.
Read MoreUnderstanding Corrosion and Salt Spray
How it’s produced, NSS testing and how to get the best results possible.
Read MorePavco Completes Acquisition of Plating Process Systems
Decorative offering is strategic complement for Pavco's distribution chain.
Read MoreRising & Shining: Industrial Polishing Services Masters Polishing and Plating
IPS has one of the largest finishing operations in North America, with a workforce of over 800 specializing in high-volume, high-quality decorative metal finishing
Read MoreFabricator’s New Powder Coat System is Technology Driven
Miller welding and machine coats big parts with process knowledge, quality control.
Read MoreProfessional Plating Expanding Brillion Plant
Three phases will be done concurrently; square footage additions will be over 60,000 square feet resulting in more than 210,000 square feet.
Read More