Giffin USA Expands with New Production Facility
Each facility includes 80,000 square feet of open floor space capable of manufacturing every metal component required for a complete finishing system.
Giffin USA has expanded its physical footprint with a new production facility at its expansive manufacturing campus that includes two facilities, both located in Auburn Hills, Michigan.
Each facility includes 80,000 square feet of open floor space capable of manufacturing every metal component required for a complete finishing system. Located just eight miles from each other, these facilities operate as one, with seamless communication between all departments within Giffin.
Established in 1980, Giffin provides turnkey integrated finishing process solutions, including building construction and conveying systems for new and existing manufacturing facilities. For more information, visit giffininc.com.
Related Content
-
The Value of Robotic Paint Performance Testing
Considerations for implementing the use of automation for paint performance testing.
-
TTX’s Automated Conveyor Carrier System Offers Wireless, Flexible Operation
ACC system designed for reliable, consistent point-to-point movement of everything from small to heavy parts.
-
Conveyors and Paint Systems
Choosing the right conveyor system, coating technology, and ancillary equipment.