marketing
Toefco Expansion Adds 20,000-Square-Foot Coating Facility
Adding to its already operating two overhead conveyor lines with more than 400 available coating specs, Toefco increased both its capacity and capabilities with the addition of a new 20,000-square-foot, high-capacity, high-temperature coating facility.
Read MoreAtotech Sold to The Carlyle Group for $3.2 billion
Carlyle, which also owns the Axalta Coating Systems brand, is a global alternative asset manager positioned in Asia, Europe and the United States through its significant range of investments.
Read MoreSRG Global Celebrates New World HQ with Opening Ceremony
The new facility, which opened this summer, is a 51,000-square-foot building currently housing more than 250 employees.
Read MorePPG Inaugurates Electrocoat Primer Pilot System in France for Aerospace
This is PPG’s second significant investment for an Aerocron ecoat primer installation, increasing global application capability for customer education.
Read MoreHenkel Webinar Focuses on Paint Stripping
Within this crucial step in the Maintenance, Repair and Overhaul (MRO) process, it controls corrosion and weight, contributes to the appearance of the aircraft, and enhances the inspection process.
Read MoreApple Launches iPhone 7 with New "Rotational 3D Polishing"
Watch Apple chief design officer Jony Ive's video at the event that highlights a new anodized finish demonstrating a polishing called "rotational 3D polishing."
Read MoreLiquid Clinic: Is Air Free?
What's the cost of compressed air and how can a business calculate air consumption?
Read MoreBenchmarking a Plating Operation to No. 1
Indiana’s Electro-Spec uses Top Shops data to improve efficiencies.
WatchPowder Clinic: Fillers for Powder Coating
How do you choose the right filler for your powder coating process?
Read MorePowder Clinic: Powder Coating Small Parts
Parts vary in size and shape, making it difficult to find "the best" process for painting small pieces.
Read More